Projects & experience

Technical work.
Documented in the field.

Experience in supply, installation, maintenance, fabrication, procurement and logistics.

Experience schedule

29 recorded engagements.

The records below reproduce the company profile’s project history. “Ongoing” describes the status recorded in that document, not a verified current project status.

29 records

Experience schedule — supply, installation, maintenance, procurement and supply
Client Scope of services Role / experience Award Completion recorded
NLNG Replacement of incomer Terasaki ACBs – 1 air circuit breakers Prime contractorMacsotech / 3T Macsotech 2021 2022
NLNG Replacement of incomer Terasaki ACBs – 2 air circuit breakers Prime contractorMacsotech / 3T Macsotech 2021 2022
NLNG Low-voltage air circuit breaker, TemPower2 AR rated, 400V, 1250A; retrofit kit and new panel door for emergency switchboards Prime contractorMacsotech / 3T Macsotech 2021 2021
NLNG Low-voltage air circuit breaker, TemPower2 AR rated, 400V, 1250A Prime contractorMacsotech / 3T Macsotech 2021 2021
Seplat Installation of Eaton spares and equipment for Oben TAM 2024 Prime contractorMacsotech / 3T Macsotech 2024 2025
Chevron Facility maintenanceCall-off order Prime contractorMacsotech / 3T Macsotech 2021 2023 (ongoing in profile)
Seplat Provision of land logistics services Prime contractorMacsotech / 3T Macsotech 2021 2023 (ongoing in profile)
Seplat Procurement, installation and calibration of pumps and accessories Prime contractorMacsotech / 3T Macsotech 2021 2022
NPDC Maintenance and repair of four 15,000 BBLS crude oil export pumps and pump engineCall-off order Prime contractorMacsotech / 3T Macsotech 2021 2023 (ongoing in profile)
ANOH Gas Crane rental and hospitality Prime contractorMacsotech / 3T Macsotech 2021 Ongoing in profile
Total E&P Nigeria Limited Complete overhaul of CAT diesel genset 1500 KVA at Total Village Prime contractorMacsotech / 3T Macsotech 2019 2019
Total E&P Nigeria Limited Top overhauling of CAT diesel genset at Ogoja Club Prime contractorMacsotech / 3T Macsotech 2018 2018
Dangote Cement PLC Repair and maintenance of Godwin pump Prime contractorMacsotech / 3T Macsotech 2018 2018
JKPEEZ Overhaul of Chevron G-3512 Prime contractorMacsotech / 3T Macsotech 2017 2017
Total E&P Nigeria Limited Provision of equipment and personnel, supply and installation Prime contractorMacsotech / 3T Macsotech 2016 2016
Total E&P Nigeria Limited Maintenance of generator sets in Port Harcourt Prime contractorMacsotech / 3T Macsotech 2016 2016
Total E&P Nigeria Limited G12 engine repair and alternator servicing Prime contractorMacsotech / 3T Macsotech 2016 2016
Total E&P Nigeria Limited AGO tank cleaning / hookup at Total Village Prime contractorMacsotech / 3T Macsotech 2015 2016
NOIT-AMOS Technical Services Ltd Engineering / as-built drawings; fabrication and construction of bund wall (4M × 41M × 41M as printed), hydrocarbon sludge tank (3.12M × 1.04M × 1.04M; 2.65 cu.m as printed), and 2MMSCFG/D cold vent; radiography of 30% weld joints and 100% radiography of 30 weld joints with 100% MPI/DPI; flushing, hydrotesting and leak detection (listed twice in the source).Dimensions and inspection wording reproduced from the profile; confirm specifications for a new scope. Prime contractorMacsotech / 3T Macsotech 2019 2020
ExxonMobil Procurement and supply of 10-ton pedestal crane Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2015 2016
Chevron Nigeria Limited Procurement and supply of shut-off valve with actuator Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2014 2015
Chevron Nigeria Limited Procurement and supply of PTFE-lined piping Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2015 2016
ExxonMobil Cathodic protection anode – E&P Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2013 2015
Chevron Nigeria Limited Supply of EGTL ATR transfer line piping and fittings Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2016 2017
Chevron Nigeria Limited Procurement and supply of pipes and fittings: weldolets and bends; 1-inch pipe, SCH 80S Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2015 2015
Chevron Nigeria Limited Procurement and supply of pipes and fittings: 20-inch 300 lbs; 18-inch 300 lbs; 14-inch 600 lbs Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2016 2017
NLNG Procurement and supply of pipes and fittings: 72-inch, 150 lb Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2019 2019
Total Procurement and supply of line pipes and bends: 1½-inch SCH 40; 2-inch SCH 80; elbows 3-inch 90° SCH 40 and 2-inch 90° SCH 40 Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2019 2019
Total Procurement and supply of line pipes and bends Prime contractorJoint partner: 3T Worldwide QRI Nigeria Limited 2019 2019

Source: supplied company profile, pages 4–9. Blank contract values have not been invented. Separately listed engagements remain separate records. View the complete source profile.

Field evidence

Project gallery.

Seplat — centrifugal pump supply and installation
Seplat — centrifugal pump installation
NLNG — Godwin GD150M pump repair
NLNG — Godwin pump repair equipment
Bhumi Armada Nigeria — FPSO tank cleaning
Bhumi Armada Nigeria — FPSO tank cleaning team
Seplat — saver pit and skimmer pump installation
Seplat — skimmer pump installation
NPDC — maintenance and overhaul of 15,000 BBLS equipment
NPDC — maintenance and overhaul detail
PSI Global Logistics & Cargo Services — end user: AGPC
Cargo services — ANOH Gas Processing Company Limited
Platform Petroleum — fabrication, construction and installation
Platform Petroleum — hookup, testing and commissioning